Warning: Use of undefined constant jquery - assumed 'jquery' (this will throw an Error in a future version of PHP) in /homepages/1/d552744159/htdocs/site-sealants/wp-content/themes/site-sealants/assets/functions/enqueue-scripts.php on line 7

Warning: Use of undefined constant jquery - assumed 'jquery' (this will throw an Error in a future version of PHP) in /homepages/1/d552744159/htdocs/site-sealants/wp-content/themes/site-sealants/assets/functions/enqueue-scripts.php on line 9

Warning: Use of undefined constant option - assumed 'option' (this will throw an Error in a future version of PHP) in /homepages/1/d552744159/htdocs/site-sealants/wp-content/themes/site-sealants/parts/nav-offcanvas-topbar.php on line 8
+44 (0)1324 832175

Warning: Use of undefined constant option - assumed 'option' (this will throw an Error in a future version of PHP) in /homepages/1/d552744159/htdocs/site-sealants/wp-content/themes/site-sealants/parts/nav-offcanvas-topbar.php on line 9
info@sitesealants.co.uk

Aberdeen Aquatic Centre Case Study

Aberdeen Aquatic Centre

We supply the full design and installation package, complying with parameters set out by NHBC and Premier Guarantee to BS8102 2009 Code of Practice for Protection of Structures Against Water from the Ground.

Project Details

Date:
Location:
Budget:
British Gas Membrane Association
CHAS
Constructionline
ISO 9001:2008
NFRC
Worksafe Contractor
PCA
Trustmark
ISO 9001
ISO 14001
OHSAS 18001
UKAS
Sika Registered
Supply Chain Sustainability School Silver